WSP – Hydropower Dam

Sector:
Geotechnical

Project Summary

CSL’s team completed a series of SCPTu soundings at an existing hydro dam location that has a highway through it in Northern Ontario. This data was used by the client to verify current conditions on the upstream and downstream sides of the dam. SCPTu soundings were completed once rockfill was drilled through. CSL’s team completed this work in harsh winter conditions along a roadway with limited access.

Loading